Beauties @ Work – September
Calendar – BEAUTIES @ WORK
If transporting concrete is on the cards, then time is of the
essence.
The swift delivery from the concrete plant to the building site is highly demanding. If a delivery arrives late, unplanned hardening of the mixture may lead to noticeable delays in construction progress. It's a task as if made for the Arocs Loader. Equipped with an economical 10.7-litre six-cylinder inline engine, the Arocs is also a dab hand on the road too, hauling up to eight cubic metres of concrete both efficiently and punctually.
Photos: Hans-Peter Schroeder